Building a House in Portugal from Scratch: Plot, PDM, Design, Permit, Cost per m² and VAT Refund (2026)
A home by the ocean or among olive groves is many expats' dream. But the road from buying land to moving in takes 1.5–3 years and needs care at every step.

| Plot | urban (urbano) only, or with building allowed under the PDM |
|---|---|
| IMT on the plot | 6.5% + 0.8% stamp duty |
| Prior information request | PIP — the municipality's answer on whether you can build |
| Construction cost | roughly €1,300–€2,500/m² and up in 2026 |
| Overall timeline | usually 18–36 months |
| VAT | refund of the 23% → 6% difference for your own permanent home |
Step 1. Choosing a plot
You cannot build on just any land. A rural plot (terreno rústico) is in most cases not meant for housing, even if the seller insists otherwise. Look for:
- an urban plot (terreno urbano / lote para construção), ideally in an approved subdivision with an alvará de loteamento;
- or a plot where the municipal master plan (PDM) explicitly allows the floor area you need.
Check with the municipality: the PDM zone, permitted building area and height, REN and RAN restrictions (ecological and agricultural reserves), road access, water, electricity and sewerage. Buying land is subject to 6.5% IMT and 0.8% stamp duty.
Step 2. Prior information request (PIP)
The Pedido de Informação Prévia is a formal request to the municipality asking whether a specific house can be built on the plot. A positive answer is valid for a limited time and protects you from refusal at the next stage. Ideally file the PIP before buying, or make it a condition of the CPCV.
Step 3. Design
An architect prepares the architectural project, and engineers produce the specialist designs: structure, water, electrics, gas, energy efficiency, acoustics and fire safety. Design usually costs 6–12% of the construction budget. Decide early on materials and method: traditional brick and concrete, light steel frame (LSF), timber or modular homes.
Step 4. Permit
Since the Simplex reform (Decreto-Lei 10/2024), many projects go through the simplified prior notification procedure (comunicação prévia), especially in areas with a detailed plan or subdivision. Otherwise a full licence is required. Municipalities must meet review deadlines, and since 5 January 2026 applications in all 308 municipalities go through the single electronic platform PEPU. Work can start once the municipal fee is paid.
Step 5. Construction
- Choose a builder licensed by IMPIC (alvará de construção) and visit their projects.
- Sign a construction contract with a fixed price, schedule, delay penalties and staged payments.
- Hire independent site supervision (fiscalização).
- Take out construction and liability insurance.
In 2026, construction costs range roughly from €1,300–€1,500/m² for a simple house to €2,500/m² and more for a high-end one, excluding the plot, design and pool. See also: Building Survey Inspection.
Step 6. Completion and occupancy permit
Once work is complete, the municipality issues the occupancy permit (autorização de utilização), an energy certificate is produced, and the house is registered with the tax office and the land registry. Utilities are then connected.
VAT: how to save 17%
The "Construir Portugal" package lets private individuals building their own permanent home reclaim the difference between 23% and 6% VAT. Conditions: the plot's price (or its tax value) plus construction costs excluding VAT must not exceed €660,982; the claim is filed online within 12 months of the occupancy permit. Keep every invoice.
Frequently asked questions (FAQ)
Can I build a house on rural land?
Usually not, or only with heavy restrictions. Only the PDM and the municipality's answer give you certainty.
What warranty does the builder give?
Under the Civil Code, structural defects in buildings carry a 5-year warranty; check the contract terms.