Construction and reconstruction in fire danger zones

How the hazard map affects the building permit and what to check before purchasing a plot or ruin.

Construction and reconstruction in fire danger zones
Photo: Alvesgaspar · CC BY-SA 4.0
Verified · October 2026
LawDecreto-Lei n.º 82/2021 (SGIFR)
Hazard classesvery low · low · medium · high · very high
APPSclasses "alta" and "muito alta"
Valid cardsmunicipal PMDFCI - until 31.12.2026 (DL 86/2026)
Off-site constructionin APPS - limited, with mandatory conclusions
Where to checkCâmara Municipal, PDM, PMDFCI

How the system works

The Integrated Management of Rural Fires (SGIFR) Act divides the area into five structural hazard classes. Lands of classes "alta" and "muito alta" form priority prevention and safety zones (APPS). It is in them that new construction outside the consolidated development is either prohibited or allowed only with exceptions and according to mandatory conclusions.

2026 twist: The nationwide ICNF hazard map, after mayoral protests, never came into force as a basis for building restrictions. Therefore, municipal forest protection plans (PMDFCI) are of decisive importance for now - their validity has been extended by Decreto-Lei n.º 86/2026 until December 31, 2026, after which they will be replaced by subregional and municipal programs of a new type. This means that the rules may change in 2027, and the answer to the question “can you build” must be received in writing from Câmara.

What to check before purchasing

  1. PDM land classification: urbano or rústico. On rústico, housing construction is limited in any case, regardless of fire risk.
  2. Hazard class of the site according to PMDFCI and, for reference, according to the ICNF map.
  3. Setbacks within the site. When new construction occurs outside the development, the building usually must provide a protective strip on its own land - on a narrow forested site this may be physically impossible.
  4. Access and water Fire engine access and water collection point are common license conditions.
  5. Ruin status. Restoration of an existing building with a confirmed area (article in the matrix, old plan) is treated differently than new construction.

Reconstruction and expansion

Repairs without increasing the area are usually possible in risk areas. Expansion, change of purpose (for example, warehouse → housing) or construction of a swimming pool and guest house may require the conclusion of the municipal forest protection commission and compliance with passive protection measures: non-combustible materials, protected ventilation, cleared perimeter. For rural tourism objects (turismo no espaço rural, turismo de habitação), the law provides for certain exceptions.

Typical trap

The advertisement “ruin with a 200 m² project” does not guarantee a license. The project may have been approved before changes to the PDM or PMDFCI or may have expired. Ask the seller for a valid permit (alvará) or a Câmara information certificate (pedido de informação prévia, PIP) - this can be ordered before the transaction.

Frequently Asked Questions

Does fire risk increase construction costs?

Yes: non-combustible materials, a water tank, protected ventilation and a large clearing perimeter significantly increase the estimate - ask the architect for a separate line for fire protection measures.

Is it possible to challenge the hazard class?

Through the municipality when revising maps; individually it takes a long time and is not guaranteed.