Occupancy Permit (Licença de Utilização) and Illegal Extensions: What to Check After the 2024 Simplex
The Simplex Urbanístico reform removed the duty to show the permit to the notary. The risks for the buyer remain — now you are the one who has to check.

| What it is | municipal permit to use the building for its intended purpose |
|---|---|
| At the deed | not required since 1 January 2024 (DL 10/2024) |
| Buildings before 7.08.1951 | exempt — only a document confirming this is needed |
| Without a permit | harder to get a mortgage, let or sell |
| Typical breaches | extensions, attic rooms, marquises, layout changes |
| Where to ask | Câmara Municipal, planning file archive |
What the occupancy permit is
The licença (today autorização) de utilização confirms that a building was built according to the approved project and can be used as a home, office or shop. It is issued by the municipality (Câmara Municipal) after construction or major renovation is completed.
Buildings constructed before 7 August 1951 (when the general building regulation came into force) did not need a permit. Instead, the municipality issues an exemption certificate (certidão de isenção).
What Simplex changed
Decreto-Lei 10/2024 abolished, from 1 January 2024, the obligation to present the occupancy permit and the technical file (ficha técnica) when signing the deed. The sale can go ahead without them.
That does not mean the permit no longer matters: See also: Certidao Permanente.
- banks usually require the permit, or a document showing it is not needed, for a mortgage;
- without a permit it is harder to register a lease or obtain an Alojamento Local registration;
- the next buyer will ask for the documents too — an irregular property is harder to sell and sells for less;
- liability for the breaches passes to the new owner.
The most common problems
- Extensions and added floors — an extra room, a garage turned into living space, an attic room.
- Marquises — enclosed balconies. They add floor area but are often built without approval.
- Layout changes — a T1 became a T2, the kitchen was merged with the living room, the bathroom was moved.
- Change of use — a shop or storage unit sold as a flat.
- Country houses — buildings on agricultural land without a permit.
How to check
- Ask the seller for the permit or the exemption certificate.
- Request the building's archive file with the approved plans from the municipality.
- Compare the plans with the actual flat, and the areas with the caderneta and the certidão permanente.
- Bring in an architect or engineer if you see discrepancies.
Can it be legalised?
Often yes, if the changes comply with planning rules. You need an architect's project, an application to the municipality, fees and sometimes works. It takes from several months to a year or more and costs from a few thousand euros. If legalisation is impossible, the municipality can order the extension to be demolished.
How to protect yourself in the CPCV
- State in the CPCV which documents the seller must provide by the deed.
- Include the right to cancel with your deposit refunded if the permit is not obtained.
- Factor the cost of legalisation into your negotiation — it is a strong argument for a discount.
Frequently asked questions (FAQ)
Will a bank lend on a house without a permit?
As a rule, no. The bank needs proof that the property is legal.
Does a new build need a permit?
Yes, the developer obtains it once construction is complete — do not sign the deed before it has been issued.
Related guides
Suspect an illegal extension?
Our partner will request the municipal records and estimate the cost of legalisation before you sign the CPCV.
Get expert advice →