Occupancy Permit (Licença de Utilização) and Illegal Extensions: What to Check After the 2024 Simplex

The Simplex Urbanístico reform removed the duty to show the permit to the notary. The risks for the buyer remain — now you are the one who has to check.

An old Lisbon house with an added terrace and an enclosed balcony
Фото: Wikimedia Commons · CC BY-SA 4.0
Verified · November 2026
What it ismunicipal permit to use the building for its intended purpose
At the deednot required since 1 January 2024 (DL 10/2024)
Buildings before 7.08.1951exempt — only a document confirming this is needed
Without a permitharder to get a mortgage, let or sell
Typical breachesextensions, attic rooms, marquises, layout changes
Where to askCâmara Municipal, planning file archive

What the occupancy permit is

The licença (today autorização) de utilização confirms that a building was built according to the approved project and can be used as a home, office or shop. It is issued by the municipality (Câmara Municipal) after construction or major renovation is completed.

Buildings constructed before 7 August 1951 (when the general building regulation came into force) did not need a permit. Instead, the municipality issues an exemption certificate (certidão de isenção).

What Simplex changed

Decreto-Lei 10/2024 abolished, from 1 January 2024, the obligation to present the occupancy permit and the technical file (ficha técnica) when signing the deed. The sale can go ahead without them.

That does not mean the permit no longer matters: See also: Certidao Permanente.

The most common problems

How to check

  1. Ask the seller for the permit or the exemption certificate.
  2. Request the building's archive file with the approved plans from the municipality.
  3. Compare the plans with the actual flat, and the areas with the caderneta and the certidão permanente.
  4. Bring in an architect or engineer if you see discrepancies.

Can it be legalised?

Often yes, if the changes comply with planning rules. You need an architect's project, an application to the municipality, fees and sometimes works. It takes from several months to a year or more and costs from a few thousand euros. If legalisation is impossible, the municipality can order the extension to be demolished.

How to protect yourself in the CPCV

Frequently asked questions (FAQ)

Will a bank lend on a house without a permit?

As a rule, no. The bank needs proof that the property is legal.

Does a new build need a permit?

Yes, the developer obtains it once construction is complete — do not sign the deed before it has been issued.